Bangalore Water Supply & Sewerage Board [Bwssb] — water supply

Report
Question

Please briefly explain why you feel this question should be reported .

Report
Cancel

Sw3 s[protected]th main srinagar near jalageramma temple .some body has put value in the middle of road and half of the houses are not getting water supply in the road since last one week.There is no response for the issue either from the concerned engineer valve man kindly look into the problem and there is no single drop of water left. there is n o specified timings also for water supply

in progress 0
sriharijois 5 years 6 Answers 294 views 0

Answers ( 6 )

  1. Please briefly explain why you feel this answer should be reported .

    Report
    Cancel

    Shastri nagar karnal shiv colony newly waste/सीवरेज line block. Kindly do the needful ASAP.

  2. Please briefly explain why you feel this answer should be reported .

    Report
    Cancel

    I Residence of jp nagar fifth section.. a pair of days once i want to replenish my tank with a load of water (private storage tank ) …it’s been a month currently…the issue is obtaining worse and worse plz do one thing .. ASAP SOLVE THIS downside

  3. Please briefly explain why you feel this answer should be reported .

    Report
    Cancel

    There is absolute no water su[[ly in twelfth C Cross fifth Main HBR Layout. nobody is fascinated by finding the matter. Even the CMC isn’t functioning. revered MLC and MLA of our space do requisite.

  4. Please briefly explain why you feel this answer should be reported .

    Report
    Cancel

    This is becoming a big issue bwssb complaint

  5. Please briefly explain why you feel this answer should be reported .

    Report
    Cancel

    sir,
    with relevance your charge system for our R.R.NO:92292/S6-378 @ 2002, second section J.P.NAGAR.is in line with the mood of your meter reader because it is showing METER STOPPED from the last four months and the( charges for 29000 lts.is being paid)and last month they need put in a brand new meter and another time they need raised the bill with constant standing of METER STOPPED and now the fees square measure for 56000lts.Acccoding to the bill no:s[protected] sub division S-5 12119 the current reading is 46000 and therefore the previous reading is 56000.the bill quantity is Rs;2, 999.00?our monthly consumption is between 20000lts. to 25000 lts.Max because the variety of occupants square measure less compared to last year.i request the involved authorities to seem into this matter and do the necessary at the earliest.
    Thanking you
    regards/ansar

  6. Please briefly explain why you feel this answer should be reported .

    Report
    Cancel

    Hi,

    iam resident of malleshpalaya Bangalore – 560075
    I want to bring this to the notice to Bangalore facility and Sewerage Board (BWSSB) is that
    serious water thieving is occurring in and around malleshpalaya space, valve men WHO is missusing
    the cauvery water by suppling it to the Appartments for Rs 1500 WHO has no cauvery water
    connection de jure.People who has legall reference to the meter isn’t obtaining the water regulary
    and needs to rely upon the water tanker that they charge large quantity of 300rs per tanker.
    This needs to stopped and, even higher authority has favorable position during this water thieving.
    Whole malleshpalaya needs to be checked and valve men and water board authorities square measure earning there financial gain
    by collection cash from the general public and not paying to the BWSSB.
    people have gotten water albeit meter isn’t put in and valve men collection cash and
    sharing with the upper authorities within the department .

    regards
    ramgowda

Leave an answer

Browse
Browse